Road Information

Interstate 75 in Georgia    
Total Mileage in State: 355 miles
Northern End: At Tennessee state line
Southern End: At Florida state line
Mileage covered in Photos: 355 miles
Counties covered in Photos: Lowndes, Cook, Tift, Turner, Crisp, Dooly, Houston, Peach, Crawford, Bibb, Monroe, Lamar, Butts, Spalding, Henry, Clayton, Fulton, Cobb, Cherokee, Bartow, Gordon, Whitfield, Catoosa
Major Junctions in Photos: I-475, near Macon
I-16, in Macon
I-675, in Stockbridge
I-285, in Forest Park
I-20, in Atlanta
I-85, in Atlanta
I-285, near Smyrna
I-575, in Kennesaw
Control Cities in Photos: Valdosta, Tifton, Cordele, Macon, Atlanta, Marietta, Kennesaw, Acworth, Cartersville, Calhoun

Northbound

Sections:
  • Section 1: Florida Border to Tifton (Exit 62)
  • Section 2: Tifton (Exit 62) to Perry (Exit 134)
  • Section 3: Perry (Exit 134) to Forsyth (Exit 187)
  • Section 4: Forsyth (Exit 187) to Morrow (Exit 233)
  • Section 5: Morrow (Exit 233) to Atlanta (Exit 250)
  • Section 6: Atlanta (Exit 250) to Kennesaw (Exit 273)
  • Section 7: Kennesaw (Exit 273) to Calhoun (Exit 315)
  • Section 8: Calhoun (Exit 315) to Tennessee Border

Section 1: Florida Border to Tifton (Exit 62)

   

Interstate 75 North as it enters Georgia from Florida, starting out in Lowndes County. (Photo taken 12/7/20).

Georgia welcome sign on Interstate 75 North. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 1. (Photo taken 12/7/20).

Interstate 75 North at Exit 2: Belleville, FL / Lake Park (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

The maximum speed limit on Interstate 75 North starts out at 70 mph. This is the standard maximum speed limit on most rural Interstate highways in Georgia. (Photo taken 12/7/20).

The minimum speed limit on most rural Interstate highways in Georgia is 40 mph, as this sign reads. (Photo taken 12/7/20).

Visitor Information Center / Rest Area on Interstate 75 North in Lowndes County. (Photo taken 12/7/20).

Take Exit 5 to Twin Lakes and Clyattville. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 4. (Photo taken 12/7/20).

Interstate 75 North at Exit 5: GA 376 - Lakes Blvd / Lake Park (Photo taken 12/7/20).

Much of Interstate 75 in Georgia maintains at least three lanes in each direction. When there are three lanes, trucks over 6 wheels are prohibited in the left lane as this sign reads. (Photo taken 12/7/20).

Another state-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 12 miles to Valdosta, 159 miles to Macon, and 240 miles to Atlanta. (Photo taken 12/7/20).

Interstate 75 North at mile marker 7. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 8. (Photo taken 12/7/20).

Take any of the next 5 exits to Valdosta. (Photo taken 12/7/20).

Take Exit 11 to Valdosta Airport. (Photo taken 12/7/20).

Interstate 75 North at Exit 11: GA 31 - Clyattville / Valdosta (Photo taken 12/7/20).

Interstate 75 North at Exit 13: Old Clyattville Rd / Valdosta (Photo taken 12/7/20).

Mile marker 14 on Interstate 75 North in Lowndes County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 15. (Photo taken 12/7/20).

Take Exit 16 to Downtown Valdosta Historic District. (Photo taken 12/7/20).

Interstate 75 North at Exit 16: US 84 / US 221 - Valdosta / Quitman (Photo taken 12/7/20).

Take Exit 18 to Valdosta State University. (Photo taken 12/7/20).

Interstate 75 North at Exit 18: GA 133 - Valdosta / Moultrie (Photo taken 12/7/20).

The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph. (Photo taken 12/7/20).

Take Exit 22 to Wiregrass Georgia Technical College. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 20. (Photo taken 12/7/20).

Interstate 75 North at Exit 22: US 41 South / GA 7 South - N Valdosta Rd / Moody Air Force Base (Photo taken 12/7/20).

Weigh Station on Interstate 75 North in Lowndes County. (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 25. (Photo taken 12/7/20).

Interstate 75 North at mile marker 27. (Photo taken 12/7/20).

Take Exit 29 to the Sheriffs Boys Ranch and Moody Air Force Base. (Photo taken 12/7/20).

Interstate 75 North at Exit 29: US 41 North / GA 7 North / GA 122 - Hahira / Barney / Lakeland (Photo taken 12/7/20).

Another mileage sign on Interstate 75 North. It's 10 miles to Adel and 134 miles to Macon. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 31. (Photo taken 12/7/20).

Interstate 75 North as it enters Cook County. (Photo taken 12/7/20).

Take Exit 32 to South Georgia Motorsports Park. (Photo taken 12/7/20).

Interstate 75 North at Exit 32: Old Coffee Rd / Cecil (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 33. (Photo taken 12/7/20).

Mile marker 35 on Interstate 75 North in Cook County. (Photo taken 12/7/20).

Interstate 75 North at Exit 37: Adel (Photo taken 12/7/20).

Take Exit 39 to Reed Bingham State Park. (Photo taken 12/7/20).

Interstate 75 North at Exit 39: Adel / Moultrie / Nashville (Photo taken 12/7/20).

Interstate 75 North at Exit 41: Rountree Bridge Rd / Sparks (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 43. (Photo taken 12/7/20).

Interstate 75 North at Exit 45: Barneyville Road (Photo taken 12/7/20).

Interstate 75 North at mile marker 46. (Photo taken 12/7/20).

Rest Area on Interstate 75 North in Cook County. (Photo taken 12/7/20).

Interstate 75 North at Exit 49: Kinard Bridge Rd / Lenox (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 13 miles to Tifton and 114 miles to Macon. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 51. (Photo taken 12/7/20).

Interstate 75 North at mile marker 52. (Photo taken 12/7/20).

Interstate 75 North as it enters Tift County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 54. (Photo taken 12/7/20).

Interstate 75 North at Exit 55: Eldorado / Omega (Photo taken 12/7/20).

Interstate 75 North at mile marker 56. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 58. (Photo taken 12/7/20).

Take Exit 59 to Southern Regional Technical College at Tifton. (Photo taken 12/7/20).

Interstate 75 North at Exit 59: Interstate 75 Business Spur - Southwell Blvd / Tifton (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield in Tifton. (Photo taken 12/7/20).

Interstate 75 North at Exit 60: South Central Ave (Photo taken 12/7/20).

Interstate 75 North at Exit 61: To US 319 South / To GA 35 South - Omega Rd / Moultrie (Photo taken 12/7/20).

Interstate 75 North at Exit 62: US 82 / GA 520 / To US 319 North - Albany / Waycross (Photo taken 12/7/20).

Section 2: Tifton (Exit 62) to Perry (Exit 134)

   

Take Exit 63A to the Georgia Secretary of State South Georgia Office. (Photo taken 12/7/20).

Interstate 75 North at Exit 63A: 2nd St (Photo taken 12/7/20).

Take Exit 63B to the Georgia Museum of Agriculture. (Photo taken 12/7/20).

Interstate 75 North at Exit 63B: 8th St (Photo taken 12/7/20).

Take Exit 64 to Abraham Baldwin College and the UGA Tifton Campus. (Photo taken 12/7/20).

Interstate 75 North at Exit 64: US 41 - Tifton / ABAC (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 65, leaving the Tifton area. (Photo taken 12/7/20).

Interstate 75 North at Exit 66: Brighton Rd (Photo taken 12/7/20).

Another state-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

Mile marker 68 on Interstate 75 North in Tift County. (Photo taken 12/7/20).

Interstate 75 North at Exit 69: Chula-Brookfield Rd (Photo taken 12/7/20).

Interstate 75 North at Exit 71: Willis Still Rd / Sunsweet (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 72. (Photo taken 12/7/20).

Interstate 75 North as it enters Turner County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 74. (Photo taken 12/7/20).

Interstate 75 North at Exit 75: Inaha Rd (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 77. (Photo taken 12/7/20).

Take Exit 78 to South Georgia State College. (Photo taken 12/7/20).

Also take Exit 78 to Jefferson Davis State Historic Site. (Photo taken 12/7/20).

Interstate 75 North at Exit 78: GA 32 - Sycamore / Ocilla (Photo taken 12/7/20).

The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

And the minimum speed limit remains 40 mph. (Photo taken 12/7/20).

Interstate 75 North at Exit 80: Bussey Rd (Photo taken 12/7/20).

Take Exit 82 to Rebecca and Wiregrass Georgia Technical College. (Photo taken 12/7/20).

Also take Exit 82 to The Parks At Chehaw. (Photo taken 12/7/20).

Interstate 75 North at Exit 82: GA 107 / GA 112 - Ashburn / Fitzgerald (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 81 miles to Macon and 160 miles to Atlanta. (Photo taken 12/7/20).

Interstate 75 North at Exit 84: GA 159 - Ashburn / Amboy (Photo taken 12/7/20).

Rest Area on Interstate 75 North in Turner County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 86. (Photo taken 12/7/20).

Interstate 75 North at mile marker 88. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 89. (Photo taken 12/7/20).

Interstate 75 North as it enters Crisp County. (Photo taken 12/7/20).

The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph. (Photo taken 12/7/20).

Interstate 75 North at Exit 92: Arabi (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 93. (Photo taken 12/7/20).

Interstate 75 North at mile marker 95. (Photo taken 12/7/20).

Interstate 75 North at Exit 97: GA 33 Connector - Wenona / Sylvester (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 98. (Photo taken 12/7/20).

Interstate 75 North at Exit 99: GA 300 South - Georgia-Florida Parkway / Albany (Photo taken 12/7/20).

Take Exit 101 to Andersonville Trail, Jimmy Carter National Historic Site, and Andersonville National Historic Site. (Photo taken 12/7/20).

Also take Exit 101 to Georgia Veterans State Park and SAM Shortline. (Photo taken 12/7/20).

Take Exit 101 to Georgia Southwestern State University as well. (Photo taken 12/7/20).

Interstate 75 North at Exit 101: US 280 / GA 30 / GA 90 - Cordele / Abbeville (Photo taken 12/7/20).

Interstate 75 North at Exit 102: GA 257 - Cordele / Hawkinsville (Photo taken 12/7/20).

Mileage sign at mile marker 103. It's 32 miles to Perry and 61 miles to Macon. (Photo taken 12/7/20).

Interstate 75 North at Exit 104: Farmers Market Road (Photo taken 12/7/20).

North of Exit 104, Interstate 75 North enters Dooly County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 106. (Photo taken 12/7/20).

Beyond the upcoming Rest Area, the next one is 55 miles ahead on Interstate 475 North. (Photo taken 12/7/20).

Rest Area on Interstate 75 North in Dooly County. (Photo taken 12/7/20).

Take Exit 109 to the Georgia State Cotton Museum. (Photo taken 12/7/20).

Interstate 75 North at Exit 109: GA 215 - Vienna / Pitts (Photo taken 12/7/20).

Interstate 75 North at mile marker 110. (Photo taken 12/7/20).

Interstate 75 North at Exit 112: GA 27 - Vienna / Hawkinsville (Photo taken 12/7/20).

More speed limit signs on Interstate 75 North. The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

Likewise, the minimum speed limit remains 40 mph. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 115. (Photo taken 12/7/20).

Interstate 75 North at Exit 117: Pinehurst (Photo taken 12/7/20).

Mile marker 118 on Interstate 75 North in Dooly County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 120. (Photo taken 12/7/20).

Interstate 75 North at Exit 121: US 41 - Unadilla (Photo taken 12/7/20).

Interstate 75 North at Exit 122: GA 230 - Unadilla / Byromville (Photo taken 12/7/20).

Interstate 75 North as it enters Houston County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 124. (Photo taken 12/7/20).

Interstate 75 North at mile marker 125. (Photo taken 12/7/20).

Take Exit 127 to Middle Georgia State University. (Photo taken 12/7/20).

Interstate 75 North at Exit 127: GA 26 - Montezuma / Hawkinsville (Photo taken 12/7/20).

Mile marker 129 on Interstate 75 North in Houston County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 131. (Photo taken 12/7/20).

Take Exit 134 to the Georgia National Fairgrounds and Agricenter as well as Go Fish Education Center. (Photo taken 12/7/20).

Interstate 75 North at Exit 134: South Perry Parkway (Photo taken 12/7/20).

Section 3: Perry (Exit 134) to Forsyth (Exit 187)

   

Interstate 75 North at Exit 135: US 41 / GA 127 / GA 224 - Perry / Larry Walker Pkwy (Photo taken 12/7/20).

Take Exit 136 to Fort Valley State University. (Photo taken 12/7/20).

Interstate 75 North at Exit 136: GA 7 - Perry / Fort Valley (Photo taken 12/7/20).

Take Exit 138 to Perry-Houston County Airport. (Photo taken 12/7/20).

Interstate 75 North at Exit 138: US 341 / GA 11 Connector - Perry Pkwy (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 139. (Photo taken 12/7/20).

Interstate 75 North as it enter Peach County. (Photo taken 12/7/20).

Interstate 75 North at Exit 142: GA 96 - Housers Mill Road (Photo taken 12/7/20).

Take Exit 144 to Robins Air Force Base and Museum of Aviation. (Photo taken 12/7/20).

Also take Exit 144 to Warner Robins. (Photo taken 12/7/20).

Interstate 75 North at Exit 144: Richard B. Russell Parkway (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 145. (Photo taken 12/7/20).

Take Exit 146 to the Museum of Aviation. (Photo taken 12/7/20).

Also take Exit 146 to Robins Air Force Base. (Photo taken 12/7/20).

Interstate 75 North at Exit 146: GA 247 Connector - Centerville / Warner Robins (Photo taken 12/7/20).

Mile marker 148 on Interstate 75 North in Peach County. (Photo taken 12/7/20).

Take Exit 149 to GA 540 West. (Photo taken 12/7/20).

Also take Exit 149 to Middle Georgia Regional Airport. (Photo taken 12/7/20).

Interstate 75 North at Exit 149: GA 49 - Byron / Fort Valley (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 150. (Photo taken 12/7/20).

Interstate 75 North at mile marker 151. (Photo taken 12/7/20).

Interstate 75 North as it briefly dips into Crawford County. (Photo taken 12/7/20).

Not even 1/4 mile later, Interstate 75 North enters Bibb County. (Photo taken 12/7/20).

Interstate 75 North at Exit 153: Sardis Church Road (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 154. (Photo taken 12/7/20).

Interstate 75 North at Exit 155: Hartley Bridge Road (Photo taken 12/7/20).

Interstate 75 North approaching Exit 156 - 1 mile on the left. (Photo taken 12/7/20).

Traffic to the Georgia Sports Hall of Fame, Tubman Museum, and Ocumulgee National Monument should remain on Interstate 75 North. (Photo taken 12/7/20).

This guide sign approaching Exit 156 shows that of the 5 current lanes, Interstate 475 North traffic must use the two left lanes or the center lane. Interstate 75 North traffic can use the two right lanes or the center lane. Thru traffic to Atlanta should follow I-475 North, since it is a few miles shorter than staying on I-75 and it bypasses the Macon area altogether. (Photo taken 12/7/20).

Interstate 75 North at Exit 156: Interstate 475 North - Atlanta (Photo taken 12/7/20).

A closer view of the ramp to Interstate 475 North via Exit 156. (Photo taken 12/7/20).

The maximum speed limit remains 70 mph on Interstate 75 North as it nears Macon. (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph on Interstate 75 North. (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 7 miles to Macon and 8 miles to the junction of Interstate 16. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 158. (Photo taken 12/7/20).

Just before Exit 160, Interstate 75 North enters the Macon city limits. (Photo taken 12/7/20).

Interstate 75 North at Exit 160: US 41 / GA 247 - Pio Nono Avenue (Photo taken 12/7/20).

Interstate 75 North at mile marker 161. (Photo taken 12/7/20).

Take Exit 162 to the State Farmers Market, Central Georgia Tech College, and Middle Georgia State University. (Photo taken 12/7/20).

Interstate 75 North at Exit 162: US 80 / GA 22 - Eisenhower Pkwy (Photo taken 12/7/20).

Interstate 75 North at Exit 163: GA 74 West - Mercer University Drive (Photo taken 12/7/20).

Interstate 75 North approaching the junction of Interstate 16 East at Exit 165 - 2 miles. (Photo taken 12/7/20).

Interstate 75 North at Exit 164: US 41 / GA 19 - Forsyth St / Hardeman Ave / Downtown (Photo taken 12/7/20).

Approaching Exit 165, traffic to Interstate 16 East is required to be in the right lane due to the reconstruction of the I-75 / I-16 interchange at the time. (Photo taken 12/7/20).

Likewise, Interstate 75 North thru traffic was required to use only the left lane approaching the junction of Interstate 16 due to the reconstruction of the interchange. (Photo taken 12/7/20).

Interstate 75 North at Exit 165: Interstate 16 East - Savannah (Photo taken 12/7/20).

A closer view of the ramp for Exit 165 to Interstate 16 East during the interchange's reconstruction. (Photo taken 12/7/20).

View on the single thru lane of Interstate 75 North at the time as traffic from Interstate 16 West merges into it on the right. Their lane will once again create two thru lanes for I-75 North through the construction zone. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 166. (Photo taken 12/7/20).

Interstate 75 North at Exit 167: US 23 / GA 87 / GA 247 South - Riverside Dr / Pierce Ave (Photo taken 12/7/20).

Now north of the construction zone at the junction of Interstate 16, the maximum speed limit of 70 mph resumes through the Macon area. (Photo taken 12/7/20).

Another state-named Interstate 75 North reassurance shield in Macon. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph as usual. (Photo taken 12/7/20).

Interstate 75 North at Exit 169: To US 23 / To GA 87 - Arkwright Rd / Riverside Dr (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 170. (Photo taken 12/7/20).

Interstate 75 North at Exit 171: US 23 / GA 87 - Riverside Dr (Photo taken 12/7/20).

Take Exit 172 to Wesley Village and the Macon Museum of Arts and Sciences. (Photo taken 12/7/20).

Interstate 75 North at Exit 172: Bass Rd (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 173. (Photo taken 12/7/20).

Interstate 75 North as it enters Monroe County. (Photo taken 12/7/20).

Interstate 75 North at Exit 175: Pate Rd / Bolingbroke (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 176. (Photo taken 12/7/20).

Here, on the left, we see an Interstate 475 END shield as I-475 prepares to rejoin Interstate 75 North on the left ahead after it bypassed Macon. (Photo taken 12/7/20).

View on Interstate 75 North as traffic from Interstate 475 North merges into it from the left. (Photo taken 12/7/20).

Interstate 75 North at mile marker 179. (Photo taken 12/7/20).

Interstate 75 North at Exit 181: Rumble Rd / Smarr (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 3 miles to Forsyth and 65 miles to Atlanta. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 183. (Photo taken 12/7/20).

Interstate 75 North at Exit 185: GA 18 - Forsyth (Photo taken 12/7/20).

Interstate 75 North at Exit 186: Tift College Dr / Juliette Rd (Photo taken 12/7/20).

Take Exit 187 to Forsyth Historic District. (Photo taken 12/7/20).

Interstate 75 North at Exit 187: GA 83 - Forsyth / Monticello (Photo taken 12/7/20).

Section 4: Forsyth (Exit 187) to Morrow (Exit 233)

   

Take Exit 188 to the Georgia Public Safety Training Center. (Photo taken 12/7/20).

Also take Exit 188 to Indian Springs State Park. (Photo taken 12/7/20).

Interstate 75 North at Exit 188: GA 42 (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 189. (Photo taken 12/7/20).

Weigh Station on Interstate 75 North in Monroe County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 191. (Photo taken 12/7/20).

Interstate 75 North at Exit 198: Johnstonville Road (Photo taken 12/7/20).

Mile marker 194 on Interstate 75 North in Monroe County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 196. (Photo taken 12/7/20).

Interstate 75 North at Exit 198: High Falls Road (Photo taken 12/7/20).

Interstate 75 North as it briefly touches into Lamar County. (Photo taken 12/7/20).

Take Exit 201 to Gordon State College. (Photo taken 12/7/20).

Interstate 75 North as it enters Butts County. (Photo taken 12/7/20).

Interstate 75 North at Exit 201: GA 36 - Jackson / Barnesville (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 203. (Photo taken 12/7/20).

Interstate 75 North at Exit 205: GA 16 - Griffin / Jackson (Photo taken 12/7/20).

At mile marker 206, Interstate 75 North enters Spalding County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 207. (Photo taken 12/7/20).

Interstate 75 North as it enters Henry County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 208. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 210. (Photo taken 12/7/20).

Take Exit 212 to Bill Gardner Pkwy and Jenkinsburg. (Photo taken 12/7/20).

Also take Exit 212 to Atlanta Motor Speedway. (Photo taken 12/7/20).

Interstate 75 North at Exit 212: Locust Grove / Hampton / Jackson (Photo taken 12/7/20).

Mileage sign on Interstate 75 North. It's 7 miles to McDonough and 34 miles to Atlanta. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 213. (Photo taken 12/7/20).

Interstate 75 North at mile marker 214. (Photo taken 12/7/20).

Take any of the next 3 exits to McDonough. (Photo taken 12/7/20).

Ahead, tolled express lanes will begin on Interstate 75 North. This sign shows the first two exits available from the express lanes. (Photo taken 12/7/20).

This overhead sign dynamically displays the current toll rates in the Interstate 75 North express lanes to each of the exits shown. Since the express lanes were closed at the time, no toll rates were shown. (Photo taken 12/7/20).

This sign warns that trucks and vehicles towing trailers are prohibited in the express lanes at all times. (Photo taken 12/7/20).

Interstate 75 North at Exit 216: GA 155 - McDonough / Griffin (Photo taken 12/7/20).

Interstate 75 North at the first express lane entrance, on the left in McDonough. (Photo taken 12/7/20).

Interstate 75 North at Exit 218: GA 20 / GA 81 - McDonough / Hampton (Photo taken 12/7/20).

Another express lane entrance exists ahead on the left. By the way, a PeachPass transponder is required to use the tolled express lanes, as they use all electronic tolling and no toll plazas exist. (Photo taken 12/7/20).

Interstate 75 North at mile marker 218.4. (Photo taken 12/7/20).

As you can see in this photo at mile marker 218.6, the express lanes only run in a single direction. Since they were closed at the time for northbound traffic (noted on this overhead sign), they were open southbound. (Photo taken 12/7/20).

Another express lane entrance on the left, which was also closed due to the express lanes being open in the southbound direction at the time. (Photo taken 12/7/20).

Approaching Exit 221, the maximum speed limit decreases to 65 mph. (Photo taken 12/7/20).

Interstate 75 North at Exit 221: Jonesboro Rd / Lovejoy (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 221. (Photo taken 12/7/20).

Interstate 75 North at Exit 222: Jodeco Rd / Flippen (Photo taken 12/7/20).

Interstate 75 North at mile marker 223, as the express lanes continue forth in the median. (Photo taken 12/7/20).

Interstate 75 North at Exit 224: Hudson Bridge Rd / Eagles Landing Pkwy (Photo taken 12/7/20).

Interstate 75 North approaching Exit 227 - 1 1/4 miles. (Photo taken 12/7/20).

The northbound express lanes, as we can see in the median, provide direct access to Interstate 675 North without having to cross the main lanes of Interstate 75 North. If not exiting to I-675 North, the express lanes will take you onto I-75 North as they come to an end just beyond Exit 227. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 226.8, approaching Exit 227. To the left, we can see the express lane exit ramp to Interstate 675 North (for northbound traffic), and the lane doubles as an express lane entrance for southbound traffic. (Photo taken 12/7/20).

Interstate 75 North at Exit 227: Interstate 675 North - Augusta / Greenville (Photo taken 12/7/20).

A closer view of the ramp to Interstate 675 North via Exit 227. On the left, express lane traffic merges into the main lanes of Interstate 75 North as the express lanes temporarily come to an end. (Photo taken 12/7/20).

Take Exit 228 to Arabia Mountain National Heritage Area. (Photo taken 12/7/20).

Interstate 75 North at Exit 228: GA 138 - Jonesboro / Stockbridge (Photo taken 12/7/20).

Interstate 75 North as it enters Clayton County. (Photo taken 12/7/20).

As Interstate 75 North now maintains four lanes, this sign warns that truck lane restrictions will vary ahead. (Photo taken 12/7/20).

The maximum speed limit remains 65 mph. (Photo taken 12/7/20).

Interstate 75 North at Exit 231: Mt Zion Blvd (Photo taken 12/7/20).

Take Exit 233 to Clayton State University, Georgia Archives, and National Archives. (Photo taken 12/7/20).

Interstate 75 North at Exit 233: GA 54 - Morrow / Lake City (Photo taken 12/7/20).

Section 5: Morrow (Exit 233) to Atlanta (Exit 250)

   

Interstate 75 North at Exit 235: US 19 / US 41 / GA 3 - Old Dixie Highway (Photo taken 12/7/20).

Trucks are currently restricted to the two right lanes on this stretch of Interstate 75 North. (Photo taken 12/7/20).

Take Exit 239 (stay on Interstate 75 North) to ATL Airport's International terminal. Take Exit 238B and follow Interstate 285 West to the airport's Domestic terminal. (Photo taken 12/7/20).

Two miles from the junction of Interstate 285, these two overhead signs warn that thru trucks over 6 wheels are required to use I-285 and bypass downtown Atlanta. (Photo taken 12/7/20).

Interstate 75 North at Exit 237: GA 331 - Forest Park / Farmers Market (Photo taken 12/7/20).

Interstate 75 North approaching Exits 238A-B. Interstate 285 traffic (and all thru trucks over 6 wheels) should keep right. (Photo taken 12/7/20).

A second sign directing airport traffic to the International and Domestic terminals. Again, International flights should follow Interstate 75 North to Exit 239. Domestic flights should follow Interstate 285 West via Exit 238B. (Photo taken 12/7/20).

Interstate 75 North at Exit 238A: Interstate 285 East - Augusta / Greenville (Photo taken 12/7/20).

Interstate 75 North at Exit 238B: Interstate 285 West - Birmingham / Chattanooga (Photo taken 12/7/20).

Now inside of Interstate 285, HOV lanes begin on Interstate 75 North at mile marker 238.4. This first HOV lane exit provides access to C.W. Grant Pkwy. (Photo taken 12/7/20).

Take Exit 239 to the airport's Air Cargo area and the International terminal. (Photo taken 12/7/20).

Interstate 75 North at Exit 239: US 19 / US 41 / GA 3 - C.W. Grant Pkwy / Porsche Ave / Central Ave (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 240. (Photo taken 12/7/20).

The maximum speed limit remains 65 mph on Interstate 75 North. (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

Just north of mile marker 241, the maximum speed limit decreases to 55 mph as Interstate 75 North enters Fulton County and begins to approach downtown Atlanta. (Photo taken 12/7/20).

Interstate 75 North at Exit 241: Cleveland Avenue (Photo taken 12/7/20).

Take Exit 243 to Cellaris Amphitheatre, Lakewood Exhibit Center, and Tyler Perry Studios. (Photo taken 12/7/20).

Interstate 75 North at Exit 243: GA 166 - Langford Pkwy / East Point (Photo taken 12/7/20).

At mile marker 242.6, Interstate 85 North traffic, which we see here on the right, prepares to merge into the northbound lanes of Interstate 75. I-75 and I-85 will run concurrently through downtown Atlanta, for the next 8.5 miles. (Photo taken 12/7/20).

View on Interstate 75 North as Interstate 85 North traffic merges into it ahead on the right. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at mile marker 243.4. During the I-75 / I-85 concurrency through downtown Atlanta, the mileage and exit numbers are based on the total mileage of Interstate 75. (Photo taken 12/7/20).

A set of state-named Interstate 75 North / Interstate 85 North reassurance shields at mile marker 243.6. (Photo taken 12/7/20).

Take Exit 244 to Atlanta Metro College and Atlanta Tech College. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 244: University Ave / Pryor St (Photo taken 12/7/20).

Take Exit 246 to World Congress Center, Mercedes-Benz Stadium, and State Farm Arena. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North as downtown Atlanta comes into view 1/4 miles from Exit 245. The leftmost lane of the duplex continues forth as a HOV lane. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North approaching Exit 247 - 1 mile. (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North at mile marker 245. (Photo taken 12/7/20).

Also take Exit 246 to Zoo Atlanta. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 245: Abernathy Blvd / Capitol Ave / Turner Field (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 246: Fulton St / Central Ave / Georgia State University (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North approaching the junction of Interstate 20 via Exit 247. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 247: Interstate 20 (Ralph D. Abernathy Fwy) - Birmingham / Augusta (Photo taken 12/7/20).

A closer view of the ramp to Interstate 20 via Exit 247, as it splits into two ramps. (Photo taken 12/7/20).

Take Exit 248C to the Jimmy Carter Presidential Library and Atlanta Medical Center. (Photo taken 12/7/20).

Overhead mileage sign on the median at mile marker 246.4, listing the distances to the next 3 exits on Interstate 75 North / Interstate 85 North as the duplex prepares to tunnel under Memorial Dr / Capitol Ave. (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North as they pass under Memorial Dr / Capitol Ave in downtown Atlanta. (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North approaching Exit 248B - 1/2 mile. (Photo taken 12/7/20).

Also take Exit 248C to MLK Jr. National Historic Park, the Aquarium, World Congress Center, and Centennial Olympic Park. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 248B: Edgewood Ave / Auburn Ave / J.W. Dobbs Ave (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 248C: GA 10 East - Andrew Young International Blvd / John Lewis Freedom Pkwy / Carter Center (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at the HOV lane exit to Piedmont Ave. (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North approaching Exit 249B, as the duplex prepares to pass under Piedmont Ave and Baker St NE. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 249B: Pine St / Peachtree St / Civic Center (Photo taken 12/7/20).

Take Exit 249D to World Of Coca-Cola and Fox Theatre. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 249D: US 19 / US 29 - Spring St / W Peachtree St (Photo taken 12/7/20).

View on Interstate 75 North / Interstate 85 North at mile marker 248.4. (Photo taken 12/7/20).

As the departure of Interstate 85 North draws near, these advance guide signs make clear that Interstate 85 North thru traffic should keep left, while Interstate 75 North traffic should keep right. (Photo taken 12/7/20).

Take Exit 250 to Woodruff Arts Center, the Atlanta Botanical Gardens, and the Center for Puppetry Arts. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 250: 10th St / 14th St / Georgia Tech (Photo taken 12/7/20).

Section 6: Atlanta (Exit 250) to Kennesaw (Exit 273)

   

Interstate 75 North / Interstate 85 North approaching the departure of I-85 North via Exit 251B. I-85 North thru traffic should keep left, in the three left lanes or center lane. I-75 North traffic should keep right, in the two rightmost lanes or the center lane. The HOV lane provides access to I-75 North via a HOV lane exit, removing the need for I-75 North thru traffic to have to cross several lanes of traffic. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 251A: 17th St / Midtown (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North nearing the departure of Interstate 85 North via Exit 251B on the left. (Photo taken 12/7/20).

Interstate 75 North / Interstate 85 North at Exit 251B: Interstate 85 North / To GA 400 - Greenville (Photo taken 12/7/20).

A closer view of the split, as Interstate 85 North traffic departs Interstate 75 North to the left. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 250.4. The HOV lane continues on the left. (Photo taken 12/7/20).

The maximum speed limit on Interstate 75 North remains 55 mph. (Photo taken 12/7/20).

Interstate 75 North at mile marker 251. (Photo taken 12/7/20).

Interstate 75 North at Exit 252A: US 41 - Northside Dr (Photo taken 12/7/20).

Interstate 75 North at Exit 252B: Howell Mill Road (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph. (Photo taken 12/7/20).

The maximum speed limit increases to 65 mph once again, 1 mile south of Exit 254. (Photo taken 12/7/20).

Interstate 75 North at Exit 254: Moores Mill Road (Photo taken 12/7/20).

Take Exit 255 to the Atlanta History Center. (Photo taken 12/7/20).

Interstate 75 North at Exit 255: US 41 - Northside Pkwy / W Paces Ferry Rd (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 255.4. (Photo taken 12/7/20).

Interstate 75 North at Exit 256: To US 41 - Mt Paran Rd / Northside Pkwy (Photo taken 12/7/20).

Two miles ahead, the HOV lane on Interstate 75 North will transition into express toll lanes, similar to those seen to the south of the Atlanta metro area on I-75. Again, PeachPass is required to use the express lanes. (Photo taken 12/7/20).

This mileage sign in the median lists the distances to the first three exits on Interstate 75 North which are accessible from the express lanes. (Photo taken 12/7/20).

Take Exit 258 to Cobb Energy Center. (Photo taken 12/7/20).

Interstate 75 North approaching Exits 259A-B - 1 mile and 1 3/4 miles respectively. (Photo taken 12/7/20).

Interstate 75 North as it prepares to enter Cobb County. This overhead sign dynamically displays the current toll rates to each of the three listed exits in the express lanes. (Photo taken 12/7/20).

Interstate 75 North at Exit 258: Cumberland Boulevard / Truist Park (Photo taken 12/7/20).

Interstate 75 North at Exit 259A: Interstate 285 East - Greenville / Augusta (Photo taken 12/7/20).

Interstate 75 North approaching Exit 259B. At this point, the HOV lane provides an exit to Akers Mill Road and Truist Park just before it transitions into an express toll lane ahead. (Photo taken 12/7/20).

Nearing Exit 259B, this overhead sign over the HOV lane shows that the HOV restrictions come to an end at this point, as the lane prepares to provide access to the express lanes ahead on the left. (Photo taken 12/7/20).

Again, a PeachPass transponder is required to use the express toll lanes as there are no toll plazas and all billing is done electronically with said transponder. (Photo taken 12/7/20).

Interstate 75 North at Exit 259B: Interstate 285 West - Birmingham / Montgomery (Photo taken 12/7/20).

Express lane entrance on the left at the ramp to Interstate 285 West via Exit 259B. (Photo taken 12/7/20).

A closer view of the express lane entrance on the left at mile marker 258.6 on Interstate 75 North. (Photo taken 12/7/20).

Interstate 75 North at Exit 260: Windy Hill Rd / Truist Park / Smyrna (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 259.2. Here we see that at the previous exit (Exit 260), the I-75 North express lanes shifted to the west and are now running along I-75 South (just to the west of it). (Photo taken 12/7/20).

Interstate 75 North at mile marker 259.4. The express lanes (both north and southbound) will continue to run alongside the southbound main lanes of I-75. We can see signage to the left here, marking their position. In other words, rather than running through the median, the express lanes during this stretch run along the west side of I-75's southbound lanes. This might not be the usual configuration, but it certainly works. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 260.4. (Photo taken 12/7/20).

Interstate 75 North at Exit 261: GA 280 - Dobbins Air Force Base / East Delk Rd (Photo taken 12/7/20).

View on Interstate 75 North. We get a clear view of the elevated express lanes off to the left here, running alongside the southbound lanes of I-75. (Photo taken 12/7/20).

Take Exit 263 to Kennesaw State's Marietta Campus. (Photo taken 12/7/20).

Interstate 75 North at Exit 263: GA 120 - Roswell / KSU Marietta Campus (Photo taken 12/7/20).

Take Exit 265 to Historic Marietta and for Tourist Information. (Photo taken 12/7/20).

Interstate 75 North at Exit 265: GA 120 Alternate - N Marietta Pkwy (Photo taken 12/7/20).

Another state-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

Interstate 75 North at Exit 267A: GA 5 Spur North - Canton Road (Photo taken 12/7/20).

Interstate 75 North at Exit 267B: GA 5 Spur South / To US 41 - Marietta (Photo taken 12/7/20).

Interstate 75 North approaching Exit 268 - 3/4 mile. The express lanes also provide direct access to Interstate 575 North and continue as express lanes on it for several miles. (Photo taken 12/7/20).

Interstate 75 North at Exit 268: Interstate 575 North / GA 5 North - Canton (Photo taken 12/7/20).

A closer view of the ramp to Interstate 575 North via Exit 268. The first overpass ahead is the ramp from the Interstate 75 express lanes to the I-575 express lanes. The second overpass is the ramp from I-575 South to I-75 South. (Photo taken 12/7/20).

Take Exit 269 to Kennesaw Mountain National Battlefield Park. (Photo taken 12/7/20).

Interstate 75 North at Exit 269: To US 41 - Barrett Pkwy / Kennesaw (Photo taken 12/7/20).

Interstate 75 North at mile marker 270. It is at this point that the express lanes have shifted back into to the median of I-75. (Photo taken 12/7/20).

Take Exit 271 to Kennesaw State University and McCollum Airport. (Photo taken 12/7/20).

Interstate 75 North at Exit 271: Chastain Road (Photo taken 12/7/20).

Speed limit signs at mile marker 271.4. The maximum speed limit remains 65 mph. (Photo taken 12/7/20).

Take Exit 273 to the Southern Museum of Civil War & Locomotive History. (Photo taken 12/7/20).

Interstate 75 North at Exit 273: Wade Green Road (Photo taken 12/7/20).

Section 7: Kennesaw (Exit 273) to Calhoun (Exit 315)

   

View on Interstate 75 North at mile marker 274, as the express lanes prepare to come to an end and their traffic will merge into the main lanes of I-75 North from the left. (Photo taken 12/7/20).

Approaching the county line, this sign marks the northern end of the Interstate 75 express lanes. (Photo taken 12/7/20).

Interstate 75 North as it enters Cherokee County. (Photo taken 12/7/20).

Upon entering Cherokee County, the maximum speed limit increases to 70 mph once again. This is the standard maximum speed limit on most rural Interstate highways in Georgia. (Photo taken 12/7/20).

Take any of the next 5 exits to Allatoona Lake. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 276. (Photo taken 12/7/20).

Interstate 75 North at Exit 277: GA 92 - Acworth / Woodstock (Photo taken 12/7/20).

North of Exit 277, Interstate 75 North enters Bartow County. (Photo taken 12/7/20).

Take Exit 278 to the Chattahoochee Technical College North Metro Campus. (Photo taken 12/7/20).

Interstate 75 North at Exit 278: Glade Rd (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 280. (Photo taken 12/7/20).

Mile marker 281 on Interstate 75 North in Bartow County. (Photo taken 12/7/20).

Take Exit 283 to Lake Point Sports. (Photo taken 12/7/20).

Interstate 75 North at Exit 283: Allatoona Road / Emerson (Photo taken 12/7/20).

Interstate 75 North approaching Exit 285 - 1/2 mile. (Photo taken 12/7/20).

Take Exit 285 to Allatoona Dam and Red Top Mountain State Park. (Photo taken 12/7/20).

Interstate 75 North at Exit 285: Red Top Mountain Road (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 286. (Photo taken 12/7/20).

Take any of the next 3 exits to Cartersville. (Photo taken 12/7/20).

Take Exit 288 to Etowah Indian Mounds and Booth Western Art Museum. (Photo taken 12/7/20).

Interstate 75 North at Exit 288: GA 113 - Cartersville / Main St (Photo taken 12/7/20).

Take Exit 290 to Georgia Highlands College. (Photo taken 12/7/20).

Also take Exit 290 to Georgia National Cemetery. (Photo taken 12/7/20).

Interstate 75 North at Exit 290: GA 20 - Rome / Canton (Photo taken 12/7/20).

Take Exit 293 to Tellus Science Museum. (Photo taken 12/7/20).

Interstate 75 North at Exit 293: US 411 - Chatsworth / White (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

Mileage sign at mile marker 294. It's 6 miles to White and 70 miles to Chattanooga. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 295. (Photo taken 12/7/20).

Interstate 75 North at Exit 296: Cassville-White Road (Photo taken 12/7/20).

Interstate 75 North at mile marker 299. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 300. (Photo taken 12/7/20).

Mile marker 302 on Interstate 75 North in Bartow County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 304. (Photo taken 12/7/20).

Take Exit 306 to Barnsley Gardens. (Photo taken 12/7/20).

Interstate 75 North at Exit 306: GA 140 - Adairsville / Summerville (Photo taken 12/7/20).

Another state-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

And as usual, the minimum speed limit remains 40 mph. (Photo taken 12/7/20).

Interstate 75 North as it enters Gordon County. (Photo taken 12/7/20).

Rest Area on Interstate 75 North in Gordon County. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 308. (Photo taken 12/7/20).

Interstate 75 North at mile marker 309. (Photo taken 12/7/20).

Interstate 75 North at Exit 310: Union Grove Road (Photo taken 12/7/20).

Mile marker 311 on Interstate 75 North in Gordon County. (Photo taken 12/7/20).

Take any of the next 4 exits to Calhoun. (Photo taken 12/7/20).

Interstate 75 North at Exit 312: GA 53 - Calhoun / Fairmount (Photo taken 12/7/20).

Interstate 75 North at Exit 315: GA 156 - Redbud Road / Calhoun (Photo taken 12/7/20).

Section 8: Calhoun (Exit 315) to Tennessee Border

   

Take Exit 317 to the Vann House Historic Site. (Photo taken 12/7/20).

Also take Exit 317 to New Echota Historic Site and the Cherokee Indian Capital. (Photo taken 12/7/20).

Interstate 75 North at Exit 317: GA 225 - Chatsworth (Photo taken 12/7/20).

Interstate 75 North at Exit 318: US 41 - Resaca (Photo taken 12/7/20).

Interstate 75 North at Exit 320: GA 136 - Resaca / LaFayette (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 322. (Photo taken 12/7/20).

Interstate 75 North as it enters Whitfield County. (Photo taken 12/7/20).

Interstate 75 North at mile marker 324. (Photo taken 12/7/20).

Interstate 75 North at Exit 326: Carbondale Road (Photo taken 12/7/20).

Interstate 75 North at Exit 328: GA 3 Connector / To US 41 (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 329. (Photo taken 12/7/20).

Mile marker 331 on Interstate 75 North in Whitfield County. (Photo taken 12/7/20).

Take either of the next 2 exits to Dalton. (Photo taken 12/7/20).

Take Exit 333 to Chatsworth and Dalton State College. (Photo taken 12/7/20).

Also take Exit 333 to the Dalton Convention Center and the Georgia High School Coaches Hall of Fame. (Photo taken 12/7/20).

Interstate 75 North at Exit 333: GA 52 - Walnut Ave / Dalton (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 334. (Photo taken 12/7/20).

Take Exit 336 to Appalachian Foothills Parkway. (Photo taken 12/7/20).

Interstate 75 North at Exit 336: US 41 / US 76 - Dalton / Rocky Face (Photo taken 12/7/20).

Interstate 75 North at mile marker 338. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 339. (Photo taken 12/7/20).

Interstate 75 North at Exit 341: GA 201 - Tunnel Hill / Varnell (Photo taken 12/7/20).

Interstate 75 North as it enters Catoosa County. (Photo taken 12/7/20).

Weigh Station on Interstate 75 North upon entering Catoosa County. (Photo taken 12/7/20).

State-named Interstate 75 North reassurance shield. (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 344. (Photo taken 12/7/20).

Interstate 75 North at Exit 345: US 41 / US 76 - Ringgold (Photo taken 12/7/20).

The maximum speed limit remains 70 mph. (Photo taken 12/7/20).

The minimum speed limit remains 40 mph. (Photo taken 12/7/20).

Take Exit 348 to Summerville. (Photo taken 12/7/20).

Interstate 75 North at Exit 348: GA 151 - Ringgold / LaFayette (Photo taken 12/7/20).

Take Exit 350 to Chickamauga Battlefield and Lookout Mountain. (Photo taken 12/7/20).

Mile marker 349 on Interstate 75 North in Catoosa County. (Photo taken 12/7/20).

Interstate 75 North at Exit 350: GA 2 - Battlefield Parkway / Fort Oglethorpe (Photo taken 12/7/20).

View on Interstate 75 North at mile marker 352. (Photo taken 12/7/20).

Take Exit 353 to Cloud Springs Rd. (Photo taken 12/7/20).

Interstate 75 North at Exit 353: GA 146 - Rossville / Fort Oglethorpe (Photo taken 12/7/20).

One final state-named Interstate 75 North reassurance shield as I-75 North nears the Tennessee border. (Photo taken 12/7/20).

The junction of Interstate 24 West is 2 miles ahead, about one miile into Tennessee. Traffic to I-24 West will have to use the left or center lanes after crossing the border. (Photo taken 12/7/20).

View on Interstate 75 North as it approaches the Tennessee border and prepares to leave Georgia. (Photo taken 12/7/20).

Advance signage for Exit 1, which we can see ahead immediately after crossing the state line into Tennessee. (Photo taken 12/7/20).