Road Information

Interstate 675 in Ohio    
Total Mileage in State: 26 miles
Northern End: At I-70, in Medway
Southern End: At I-75, in Miamisburg
Mileage covered in Photos: 26 miles
Counties covered in Photos: Montgomery, Greene, Clark
Major Junctions in Photos: US 35, in Beavercreek
I-70, in Medway
Control Cities in Photos: Miamisburg, Centerville, Beavercreek, Fairborn, Medway

Northbound

A Newer Version of This Guide is Available:
   

Speed limit sign on upon merging onto Interstate 675 North from Interstate 75 North. The speed limit starts out at 65 mph and remains that way for the entire 26-mile duration of I-675.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 1, as the ramp from Interstate 75 South (on the left) prepares to join up with the ramp from Interstate 75 North to form two lanes on I-675 North.  (Photo taken 4/17/16).

Interstate 675 North assurance shield approaching Exit 2.  (Photo taken 4/17/16).

Interstate 675 North at Exit 2: OH 725 - Miamisburg / Centerville  (Photo taken 4/17/16).

Speed limit assurance sign just beyond Exit 2. Speed Limit - 65 mph.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 4.  (Photo taken 4/17/16).

Interstate 675 North at Exit 4A: OH 48 South - Centerville  (Photo taken 4/17/16).

Interstate 675 North at Exit 4B: OH 48 North - Kettering  (Photo taken 4/17/16).

Interstate 675 North assurance shield just beyond Exit 4B.  (Photo taken 4/17/16).

Interstate 675 North at Exit 7: Wilmington Pike / Centerville/ Bellbrook  (Photo taken 4/17/16).

Interstate 675 North entering Greene County.  (Photo taken 4/17/16).

Interstate 675 North as it finally curves to the north.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 9.  (Photo taken 4/17/16).

Take any of the next 4 exits to Beavercreek.  (Photo taken 4/17/16).

Take Exit 10 to American National University.  (Photo taken 4/17/16).

Interstate 675 North at Exit 10: Dorothy Lane / Indian Ripple Rd  (Photo taken 4/17/16).

Mileage sign north of Exit 10. It's 4 miles to Wright-Patterson Air Force Base and 15 miles to the junction of Interstate 70.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 12.  (Photo taken 4/17/16).

Interstate 675 North at Exit 13A: US 35 East - Xenia  (Photo taken 4/17/16).

Interstate 675 North at Exit 13B: US 35 West - Dayton  (Photo taken 4/17/16).

Interstate 675 North assurance shield north of Exit 13B.  (Photo taken 4/17/16).

Take Exit 17 to Wright-Patterson Air Force Base Area A.  (Photo taken 4/17/16).

Take Exit 15 to the Air Force Museum and Wright Bros Sites.  (Photo taken 4/17/16).

Take Exit 15 or Exit 17 to Nutter Center.  (Photo taken 4/17/16).

Interstate 675 North at Exit 15: W.P.A.F.B. Area B / Col Glenn Hwy  (Photo taken 4/17/16).

Take any of the next 4 exits to Fairborn.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 16.  (Photo taken 4/17/16).

Take Exit 17 to Nutter Center, Wright State Univ, and Clark State College.  (Photo taken 4/17/16).

Interstate 675 North at Exit 17: OH 844 - N Fairfield Rd / W.P.A.F.B. Area A  (Photo taken 4/17/16).

Just beyond Exit 17, the rightmost lane prepares to come to an end resulting in Interstate 675 maintaining two lanes for the rest of its duration.  (Photo taken 4/17/16).

Interstate 675 North assurance shield.  (Photo taken 4/17/16).

Mileage sign on Interstate 675 North. It's 8 miles to the junction of Interstate 70, 21 miles to Springfield, and 64 miles to Columbus.  (Photo taken 4/17/16).

Interstate 675 North at mile marker 19.  (Photo taken 4/17/16).

Take Exit 20 to John Bryan State Park.  (Photo taken 4/17/16).

Also take Exit 20 to Antioch University and Greene County Career Center.  (Photo taken 4/17/16).

Interstate 675 North at Exit 20: Dayton-Yellow Springs Rd  (Photo taken 4/17/16).

Interstate 675 North at mile marker 21.  (Photo taken 4/17/16).

Interstate 675 North at Exit 22: OH 235 - Fairborn  (Photo taken 4/17/16).

Another Interstate 675 North assurance shield.  (Photo taken 4/17/16).

Mileage sign north of Exit 22. It's 3 miles to the junction of Interstate 70, 16 miles to Springfield and 59 miles to Columbus.  (Photo taken 4/17/16).

Interstate 675 North at Exit 24: OH 444 - Enon  (Photo taken 4/17/16).

Interstate 675 North entering Clark County.  (Photo taken 4/17/16).

One mile from the northern terminus of Interstate 675, these signs warn that the freeway ends. As you will see at the northern terminus, the road is reduced to two lanes total and it continues north as Spangler Road.  (Photo taken 4/17/16).

Interstate 675 North approaching Exit 26A - 1/2 mile.  (Photo taken 4/17/16).

Interstate 675 North at Exit 26A: Interstate 70 East / OH 4 East - Springfield / Columbus  (Photo taken 4/17/16).

Interstate 675 North at Exit 26B: Interstate 70 West / OH 4 West - Dayton  (Photo taken 4/17/16).

At mile marker 26.6, Interstate 675 North approaches its northern terminus.  (Photo taken 4/17/16).

Interstate 675 North at its northern terminus, as Spangler Rd takes over.  (Photo taken 4/17/16).